BOSS

Actions

Actions to Protect Area

  • Protect stone floor by running tires over plywood.
  • Move tools and machines carefully.
  • Set up tools and generator in safe location.
  • Set up floating, negative-air system to protect store and prevent dust.

Actions to Prep Area

  • Remove etched signage within negative air environment to prevent dust and debris.

Actions for Installation

  • Install new limestone in pattern and color to match existing stone.

Actions to Seal and Finish

  • Seal limestone panel with penetrating high density sealer.
  • Clean and seal limestone floor with penetrating high density sealer..

Completed

  • Follow up with an annual or scheduled Clean and Seal Stone Care Program.