BOSS
Actions
Remove Signage and Replace with Matched Stone
Actions to Protect Area
- Protect stone floor by running tires over plywood.
- Move tools and machines carefully.
- Set up tools and generator in safe location.
- Set up floating, negative-air system to protect store and prevent dust.



Actions to Prep Area
- Remove etched signage within negative air environment to prevent dust and debris.


Actions for Installation
- Install new limestone in pattern and color to match existing stone.



Actions to Seal and Finish
- Seal limestone panel with penetrating high density sealer.
- Clean and seal limestone floor with penetrating high density sealer..

Completed
Follow up with an annual or scheduled Clean and Seal Stone Care Program.

