COACH Actions Restore Facade to Original Appearance Actions to Protect Area Protect sidewalk surface by running tires over plywood.Protect pedestrians, surround lift area with cones,signs and caution tape. Actions to Prep and Repair Remove existing signage.Locate anchor holes.Fill 64 large and small anchor holes Actions to Repair and Resurface Resurface entire second story facade to:Remove staining and shadow effect caused by the pre-existing signage.Remove excess hole repair materialCreate uniform surface. Actions to Seal and Finish Clean surface.Apply heavy duty exterior sealer. Completed Follow up with an annual or scheduled Clean and Seal Stone Care Program.