Marriott Ko Olina

Koi Fishpond Foot Bridge

Actions to Protect Area

  • Cover rails with plastic and paper.
  • Use blue tape for low areas.
  • Move tools and machines carefully.
  • Set up tools and generator in safe location.
  • Set up negative air system to prevent dust.

Actions to Prep Area

  • Remove old coating.
  • Use vacuum assisted machines to clean and per-air surface for “Tuff Stuff” non slip coating.

Actions for Installation

  • Prepare epoxy and aggregate.
  • Install TUFF STUFF NonSlip Grip over prepared surface.

Actions to Seal and Finish

  • Mix color for sealer.
  • Apply color-tinted sealer.
  • Allow two hours to dry.

Completed