Marriott Ko Olina
Waterslide Walkway
Actions to Protect Area
- Cover rails with plastic and paper.
- Use blue tape for low areas.
- Move tools and machines carefully.
- Set up tools and generator in safe location.
- Cleaning is a “wet” operation.


Actions to Prep Area
- Allow to dry.
- Apply base coat of UV stable epoxy.
- Allow base coat to cure.


Actions for Installation
- Remove excess material.
- Apply clean seal coat.
- Allow two hours to dry.


Actions to Seal and Finish
- Mix sealer.
- Apply sealer.
- Allow two hours to dry.


